Existing School Campus requires structural, civil and electrical assesments as well as architectural redisign to improve spatial efficiency and recommend planning adjustments for smarter flow in the masterplan layout

Project Scope

The EMI team will work to provide site and building evaluations and recommendations of repair or improvements needed to the existing campus. This includes the four major buildings, site retaining walls, utility systems, and roadways/parking lots. Also to provide masterplan services in the form of recommendations and design for optimizing existing building spaces and for the potential replacement of any buildings that are found to be structurally compromised.  

Needs

Architecture  — Planning, Interior, Gen. Arch.

School Design

Civil Engineering  — Potable Water, Wastewater, Erosion, Civil Engineering
Electrical Engineering  — Electrical Engineering
Structural Engineering  — Structural Engineering

Existing Structures Assessment

To give, please select your currency:

EMI presently accepts donations in these currencies at EMI Canada, EMI UK, EMI Uganda, EMI USA, and EMI South Africa respectively. Where applicable, donations made to EMI are tax-deductible.